Orginal Article

Enhanced lakebed sediment erosion in Dongting Lake induced by the operation of the Three Gorges Reservoir

  • ZHOU Yongqiang , 1, 2, 3 ,
  • LI Jingbao , 1, * ,
  • ZHANG Yunlin 2 ,
  • ZHANG Xinping 1 ,
  • LI Xichun 4
Expand
  • 1. College of Resources and Environmental Sciences, Hunan Normal University, Changsha 410081, China
  • 2. Nanjing Institute of Geography and Limnology, CAS, Nanjing 210008, China
  • 3. University of Chinese Academy of Sciences, Beijing 100049, China
  • 4. Hunan Hydro & Power Design Institute, Changsha 410007, China

*Corresponding author: Li Jingbao (1951-), Professor, E-mail:

Author: Zhou Yongqiang (1988-), PhD, specialized in unraveling the dynamics of lake ecosystem. E-mail:

Received date: 2015-02-09

  Accepted date: 2015-03-20

  Online published: 2015-07-17

Supported by

National Natural Science Foundation of China, No.41071067

Program of the Key Discipline Construction of the Physical Geography in Hunan Province

Copyright

Journal of Geographical Sciences, All Rights Reserved

Abstract

Based on field-survey hydrological series in the Dongting Lake watershed from 1951 to 2011, the variations of lakebed sediment siltation/erosion (S/E) regimes of the Dongting Lake after the operation of the Three Gorges Reservoir (TGR) were analyzed. Significantly positive correlations were found between the flow rate from Zhicheng and the Three Outlets (r2=0.859, p<0.0001), and between the flow rate and sediment delivery rate at the Three Outlets (r2=0.895, p<0.0001). This indicated that the flow rate and sediment delivery rate at the Three Outlets were largely determined by the flow rate from the upstream Yangtze River. Sediment deposition amount in the Dongting Lake basin dropped from +4796.4×104 t during the period before the operation of TGR (1999-2002) to +684.1×104 t, +449.8×104 t and -559.6×104 t during the impoundment Phases I, II and III of TGR. The S/E regimes changed from a siltation-dominant to an erosion-dominant state under the pre-discharge, water-storage and water-supplement dispatch over the impoundment from Phase I to III. The sediment deposition amount decreased dramatically under the flood-storage dispatch over the impoundment Phase I to III. The estimated annual mean flow rate, sediment delivery rate and sediment concentration thresholds were respectively 970.81 m3/s, 466.82 kg/s and 0.481 kg/m3 for the upstream Three Outlets to maintain an erosion-dominant state in the downstream linked the Dongting Lake.

Cite this article

ZHOU Yongqiang , LI Jingbao , ZHANG Yunlin , ZHANG Xinping , LI Xichun . Enhanced lakebed sediment erosion in Dongting Lake induced by the operation of the Three Gorges Reservoir[J]. Journal of Geographical Sciences, 2015 , 25(8) : 917 -929 . DOI: 10.1007/s11442-015-1210-y

1 Introduction

The operation of large-scale water conservancy projects can change the natural hydrological cycles and sediment translocation processes in downstream linked lakes, and further result in the adjustment of lakebed shapes (Sharaf El Din, 1977; Keown et al., 1986; Walling, 2006). Yangtze River is known as the largest river in China. The middle Yangtze River has experienced the blocking of Tiaoxian outlet, the Jingjiang truncation and and the river closure of Gezhouba, etc. (Li et al., 2005) over the last 60 years. These anthropogenic activities resulted in the adjustments of the relationships between the Yangtze River and the Dongting Lake (Han, 1999; Xu et al., 2004; Fu et al., 2005). The operation of the Three Gorges Reservoir (TGR) resulted in a deposition of vast amount of sediment in the reservoir. This further resulted in an unsaturated sediment carrying capacity in the downstream linked riverway (He et al., 2006). After the impoundment of TGR, especially under the dispatching mode of water-supplement and water-storage, riverbed sediment erosions happened to the downstream linked Jingjiang River. This implied a potential enhanced lakebed sedment erosion can happen to the downstream linked the Dongting Lake.
The relationship between the Dongting Lake and the Yangtze River and flood damages in the Dongting Lake watershed have been studied by the scholars from different perspectives (Zhang et al., 2010; Lu et al., 1999; Lu et al., 2006; Li et al., 2009; Zhong et al., 2008; Wang et al., 2003; Dai et al., 2005). However, few studies have been concerning on the threshold values of upstream water and sediment regulation to achieve a healthy Dongting Lake. How will the regimes (siltation or erosion, S/E) regarding to the lakebed sediment of the Dongting Lake respond to the operation of TGR remains largely unknown.
Therefore, the primary objective of the study was to characterize the lakebed sediment S/E processes of the Dongting Lake after the operation of TGR based on the field-survey hydrological series. By examining the relationships between flow rate and sediment delivery rate of the Three Outlets(The Three Outlets refer to the Songzi (Songzikou and Shadaoguan), Taiping (Mituosi) and Ouchi (Kangjiagang and Guanjiapu)) and S/E rate in the Dongting Lake, we sought to unravel the threshold values for water and sediment regulation of the upstream TGR to maintain a healthy state of the lake from the perspective of lakebed sediment deposition.

2 Material and methods

2.1 Hydrological data

Daily inflow and outflow rate of TGR were provided by the Yangtze River hydrological data service system (http://www.ctg.com.cn/inc/sqsk.php#1643). The daily flow rate of hydrological stations in the Dongting Lake watershed and the middle reaches of the Yangtze River were provided by the Hunan Hydro & Power Design Institute and the Hunan hydrological data service system (http://www.hnsw.com.cn/tabid/230/Default.aspx). Long-term (1951- 2011) sediment delivery rate were provided by Changjiang (Yangtze) Water Resources Committee and the Hunan Hydro & Power Design Institute and were well validated by the data in Yangtze River Sediment Bulletin2(2 http://www.cjh.com.cn/pages/nsgb.html).

2.2 Analysis method

Based on the hydrological relationship between TGR and the Dongting Lake, we sought to unravel the hydraulic connections among the outflow rate of TGR, flow rate at Zhicheng and the Three Outlets. The lakebed sediment S/E rate was estimated by the difference between inflow and outflow sediment delivery rate in the lake. It is noteworthy that the lakebed sediment S/E rate was calculated without considering the inflow sediment dilivery rate from the ungauged regions in the lake watershed. The lakebed sediment S/E regimes of the Dongting Lake were then analyzed. By investigating the correlation between the inflow rate at upstream Three Outlets and S/E rate in the Dongting Lake, the water and sediment regulation thresholds of upstream TGR were estimated.

3 Hydrological relationship between TGR and Dongting Lake

Dongting Lake receives water and sediment from the Three Outlets in the south bank of Jingjiang in the middle reach (SJR) of the Yangtze River and the Four Rivers1( The Four Rivers indicate the four major rivers in the Dongting Lake watershed, including rivers of Xiangjiang, Zishui, Yuanjiang and Lishui.) in the lake watershed and finally discharged them to the Yangtze River at Chenglingji (Figure 1). The normal water level and the corresponding flood control capacity of TGR under the dispatching mode of water-storage are 175 m and 221.5× 108 m3, respectively. The drainage area of TGR is approximately 100×104 km2 2(2 “Report on the River-Lake Relationship and Flood Control in the Middle and Lower Reaches of Yangtze River”.(Edited by Changjiang (Yangtze) Water Resources Committee, 2006)). Thus, the flow rate at Zhicheng can be largely controlled by the operation of TGR. Water and sediment are discharged into the Dongting Lake from the Jingjiang reach of the Yangtze River via the Three Outlets. The hydrological processes of the Dongting Lake are therefore closely related to the water and sediment outflow rate from TGR. Significantly positive correlations were found between the outflow rate of TGR and the flow rate at Yichang, and between the flow rate at Yichang and Zhicheng (p<0.0001) (Figure 2). The distances between Huanglingmiao (the hydrological station right at the downstream of TGR) and Yichang, and between Yichang and Zhicheng were 35 and 58 km, respectively. This suggested that after minimizing the time-lag effect, the correlations aforementioned can be better, and further substantiated that the flow rate at Zhicheng has been directly controlled by the outflw rate of TGR.
Figure 1 Locations of hydrological stations in the Dongting Lake watershed
Figure 2 Relationships between the flow rate at Yichang and the outflow rate from the Three Gorges Reservoir (a) and between the flow rate at Yichang and Zhicheng (b)
Significantly positive relationship was found between the flow rate at the Three Outlets and the flow rate at Zhicheng (p<0.0001, Figure 3). The multi-year annual mean sediment discharge from the Three Outlets before the operation of TGR could be up to 14125.48×104 t and contributed a percentage of 81.53% of the total inflow sediment discharge amount to the Dongting Lake. The corresponding annual mean inflow sediment discharge from the Four Rivers was 3198.31×104 t and was relatively stable. This indicated that the lakebed sediment S/E amount can be largely determined by the inflow sediment discharge from the upstream Three Outlets. Close relationship was found between the flow rate and sediment delivery rate from the Three Outlets (p<0.0001, Figure 3). This implied that the sediment delivery rate from the Three Outlets can be largely determined by the corresponding flow rate.
Figure 3 Relationships between the flow rate at Zhicheng and at the Three Outlets (a) and between the flow rate and sediment delivery rate at the Three Outlets (b)
The runoff and sediment discharge from the Three Outlets and lakebed sediment deposition amount in the Dongting Lake exhibited similar patterns over the last 60 years, with the abundances showed wavelike decrease changes (Figure 4). After the impoundment of TGR, the sediment discharge from the Three Outlets and lakebed sediment deposition amount in the Dongting Lake displayed notable decrease trends. The lakebed sediment S/E regimes changed from a siltation-dominant state to an erosion-dominant state during the period. This further suggested a dramatic change has probably happened to the Yangtze River-Dongting Lake (River-Lake) system after the impoundment of TGR.
Figure 4 Variations of runoff and sediment discharge from the Three Outlets and sediment S/E amount of the Dongting Lake in different periods of time

4 Variation of lakebed sediment S/E regimes before the operation of TGR

In order to elucidate the lakebed sediment S/E characteristics in the Dongting Lake after the impoundment of TGR, the period before the operation of TGR (1951-2002) is divided into the following six phases (Li et al., 2009). The pre- (1951-1958) and post- (1959-1966) plugging of the Tiaoxian Outlet, the Jingjiang truncation (1967-1972), the pre-operation of Gezhouba (1973-1980), the post-operation of Gezhouba (1981-1998) and the pre-operation of TGR (1999-2002).
To investigate the interannual variation of lakebed sediment S/E regimes of the Dongting Lake, the mean inflow runoff and sediment discharge to the lake during the period of pre-plugging of the Tiaoxian Outlet (1951-1958) was used as reference. The annual mean inflow runoff and sediment discharge from the Three Outlets decreased respectively by 277.1×108 m3, 587.7×108 m3, 776.1×108 m3, 918.2×108 m3, 987.7×108 m3 and 4053.3×104 t, 8867.6×104 t, 11965.8×104 t, 13700.9×104 t, 17385.7×104 t during the periods of 1959-1966, 1967-1972, 1973-1980, 1981-1998 and 1999-2002 (Table 1). The corresponding decreasing amplitudes were 17.18%, 36.44%, 48.13%, 56.94%, 61.25% and 17.59%, 38.49%, 51.93%, 59.46%, 75.45%, respectively. This further substantiated that the sediment discharge from the Three Outlets was controlled by the corresponding runoff amount. The annual runoff of the Four Rivers varied slightly (-11.77% to 4.35%) during the six aforementioned periods. Notable decrease trends were observed for the mean inflow runoff and sediment discharge to the lake. It is noteworthy that the annual mean inflow runoff to the lake increased from 2713.3×108 m3 to 2815.5×108 m3 whereas the annual sediment discharge decreased from 11687.9×104 t to 6827.2×104 t. This can be explained by the Jingjiang truncation and the Yangtze River closure at Gezhouba. The decreased inflow runoff and sediment discharge to the Dongting Lake over the six periods resulted in a decreased outflow runoff and sediment discharge from the Dongting Lake to the Yangtze River at Chenglingji. The outflow sediment discharge decreased by 13.66%, 21.72%, 42.86%, 55.94 and 69.69% over the periods of 1959-1966, 1967-1972, 1973-1980, 1981-1998 and 1999-2002. It is notable that the outflow sediment discharge was much lower than the inflow amount during the corresponding period. This indicated a large amount of sediment was deposited in the lake over the last 60 years.
Table 1 Variations of annual mean runoff (108 m3), sediment discharge and deposited (104 t) and corresponding deposition rate (%) in the Dongting Lake during the time periods before the operation of the Three Gorges Reservoir. The Three Outlets: TO; The Four Rivers: FR; Ungauged region: UGR
Period Annual mean inflow runoff Inflow sediment discharge Outflow sediment discharge Sediment
deposited
amount
Sediment
deposition
rate
TO FR UGR The sum TO FR The sum
1951-1958 1612.6 1741.9 299.1 3653.6 23041.6 4230.6 27272.2 6715.7 20556.5 75.38
1959-1966 1335.5 1536.9 225.8 3098.2 18988.3 2905.7 21894.0 5786.0 16108.0 73.57
1967-1972 1024.9 1727.9 255.3 3008.1 14174.0 4080.0 18254.0 5246.0 13008.0 71.26
1973-1980 836.5 1698.9 256.2 2791.6 11075.8 3712.5 14788.3 3828.8 10959.5 74.11
1981-1998 694.4 1702.9 316.0 2713.3 9340.7 2347.2 11687.9 2952.8 8735.1 74.74
1999-2002 624.9 1817.7 372.9 2815.5 5655.9 1171.3 6827.2 2030.8 4796.4 70.25
Based on the Law of Conservation of Mass that the lakebed sediment S/E amount in the Dongting Lake is estimated by subtracting the outflow from the inflow sediment discharge to the lake, we can arrive at following a few rational conclusions. (1) During the flood season (May to October) of the lake watershed, flood surged into the lake accompanied by the block effect at Chenglingji induced by the high water level in the main stream of the Yangtze River (Duan et al., 2001), vast amount of sediment were deposited to the lakebed. Due to the decreasing inflow sediment discharge of the Three Outlets, the lakebed sediment deposition amount decreased by 5.36%, 36.47%, 48.01%, 57.60% and 75.60% during the periods of 1959-1966, 1967-1972, 1973-1980, 1981-1998 and 1999-2002 compared to that in 1951-1958. (2) In the low water season (January to April and November to December), the unsaturated sediment carrying capacity in the riverway resulted in a lakebed sediment erosion (Table 2). During the period of 1999-2002, the intra-annual erosion state prelonged from April to May. Similar to the lakebed sediment deposition amount in the lake, the erosion amount during the corresponding period decreased by 7.07%, 23.35%, 55.32%, 52.76% and 60.31%, respectively (Table 2). This can be explained by a decreased water level at the Three Outlets resulted from large-scale water conservancy projects in the main stream of the middle reach of the Yangtze River.
Table 2 Variations of monthly mean sediment S/E amount (104 t) in the Dongting Lake during the time periods before the operation of TGR. Depo: Deposition amount; Eros: Erosion amount
Time (yr) Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Dep Ero
1951-1958 -132 -183 -351 -487 565 2496 8183 7556 2731 507 -93 -219 22545 -1683
1959-1966 -124 -211 -384 -409 449 1671 5806 5284 3619 888 -184 -252 21337 -1564
1967-1972 -115 -134 -327 -405 861 1872 5364 3077 2450 700 -145 -163 14323 -1290
1973-1980 -40 -125 -185 -243 389 2017 3566 2945 2231 574 -78 -81 11722 -752
1981-1998 -83 -134 -211 -201 87 1041 4078 2519 1570 263 -87 -79 9558 -795
1999-2002 -60 -48 -150 -204 -23 754 2095 1504 995 151 -106 -78 5500 -668

5 Variation of lakebed sediment S/E regimes after the operation of TGR

5.1 Differentiating the phases and dispatching modes of the operation of TGR

The operation of TGR began in May 2003, and the water level of the reservoir rose up to 135 m in June 2003. In October 2006, water level of the reservoir rose up to 156 m, flood control water level in 2008 was 145 m and water level during the non-flood season rose up to 172.8 m in October 2008. It increased to 175 m during the non-flood period in 20101( “The Optimization Scheduling Solution of TGR” (Edited by Changjiang (Yangtze) Water Resources Committee, 2009)). This indicated that the impoundment of TGR (June 2003 to December 2011) can be divided into the following three different phases. Phase I, period of cofferdam (June 2003 to September 2006). Phase II, the preliminary operation period of TGR (October 2006 to September 2008). Phase III, the official launching period (October 2008 to December 2011).
The runoff in the middle and lower reaches of the Yangtze River has changed dramatically since the operation of TGR, the hydrological year of the middle reaches of the Yangtze River after the operation of TGR (2003 to 2011) was therefore determined. The level of high or low water season in the middle reaches of the Yangtze River was estimated according to the Hydrological Forecast Specification edited by the Ministry of Water Resources of China:
where the time period is wet if P > 20%; if 10% < P≤20%, the time period is wet-like; if -10% <P≤10%, the time period is normal; if -20% < P≤-10%, the time period is dry-like; if P≤-20%, the time period is dry. The runoff departure of the middle reaches of the Yangtze River is calculated base on the runoff at the hydrological station Zhicheng (Table 3).
Table 3 Departures of runoff in the middle and lower reaches of the Yangtze River during different water impoundment phases of TGR
Phase Phase I Phase II Phase III
Time 2003.6-12 2004 2005 2006.1-9 2006.10-12 2007 2008.1-9 2008.10-12 2009 2010 2011
Depar +14.04 +5.54 +13.52 -29.19 -18.12 +7.00 +3.29 +16.40 +0.92 +2.69 -17.29
According to the optimization scheduling solution of TGR aforementioned, TGR is under the pre-discharge dispatch during May to June. Water level of TGR during this time period decreased from 155 to 145 m, and the corresponding flow rate in the downstream riverway increased by 3800 m3/s. The flood-storage dispatch of TGR occurs in July to August, and water level of TGR is lowered down to 145 m. During September to October, TGR is under the water-storage dispatch, and the water level of the reservoir increased from 145 to 175 m, and the corresponding outflow rate decreased by 5500 m3/s. The water-supplement dispatch of TGR occurs during the time period ranging from December to April, when the water level of the reservoir decreased from 175 to 155 m, the corresponding outflow rate of TGR increased by 1000-2000 m3/s (Li et al., 2011). The lakebed sediment S/E rate will be influenced by both the impoundment phase and the dispatching mode of TGR.

5.2 Variation of lakebed sediment S/E regimes under different impoundment phases of TGR

During the impoundment Phase I of TGR (June 2003 to September 2006), water level of the reservoir during flood season was 135.5 m, and increased to 139 m during the non-flood season1( “The Optimization Scheduling Solution of TGR” (Edited by Changjiang (Yangtze) Water Resources Committee, 2009)). Compared with the time period of 1999 to 2002, the multi-year mean annual inflow runoff and sediment discharge from the Three Outlets decreased respectively by 180.6×108 m3 and 4318.7×104 t. Simultaneously, the annual inflow runoff and sediment discharge from the Four Rivers decreased by 296.2×108 m3 and 310.8×104 t, respectively. The outflow runoff from Dongting Lake at Chenglingji decreased by 25.47% during the corresponding time period, and could be explained by a decreased inflow runoff and hence with lower sediment carrying capacity compared to 1999 to 2002.
The lakebed sediment deposited in Dongting Lake mainly comes from the Yangtze River via the Three Outlets. The annual lakebed sediment deposition amount in the Dongting Lake decreased by 4112.3×104 t compared to that in the period 1999-2002 (Table 4). This indicated that although the lakebed sediment S/E regimes were still dominate by deposition, the rate in the impoundment Phase I of TGR was lowered down dramatically compared to that deposition in 1999 to 2002. It is notable that the lakebed sediment erosion amount was higher than corresponding deposition amount during January to September 2006. The erosion amount can be up to 227.7×104 t during the time period. We assume that the mean bulk weight of lakebed sediment and the lake surface area are respectively 1.3 t/m3 and 2625 km2 1( “The Synthetic Layout Report in the Dongting Lake Area” (Edited by Changjiang (Yangtze) Water Resources Committee, 2010).), and the scouring depth during the time period can be estimated as 0.067 m. This indicated that despite the dry hydrological condition during the time period, the positive effects of TGR on lakebed sediment erosion in Dongting Lake were notable.
Table 4 Variations of annual mean runoff (108 m3), sediment discharge and deposited (104 t) and corresponding deposition rate (%) in Dongting Lake during different impoundment phases of the Three Gorges Reservoir. The Three Outlets: TO; The Four Rivers: FR; Ungauged region: UGR, *: Impoundment Phase I; **: Phase II; ***: Phase III; “+”: deposition; “-”: erosion
Time
(yr)
Annual mean inflow runoff Inflow sediment discharge Outflow sediment discharge Sediment deposited
amount
Sediment deposition rate
TO FR UGR The sum TO FR The sum
1999-2002 624.9 1817.7 372.9 2815.5 5655.9 1171.3 6827.2 2030.8 +4796.6 +70.25
2003.06-12* 551.5 724.4 155.8 1449.7 2020.9 1374.5 3415.4 716.8 +2698.6 +79.01
2004* 524.7 1499.4 306.0 2330.1 1448.0 914.6 2362.6 1429.9 +932.7 +39.48
2005* 625.6 1510.8 261.0 2397.4 2401.6 640.1 3041.7 1593.5 +1448.2 +47.61
2006.01-09* 166.5 1385.0 184.5 1736.0 162.0 1011.0 1173.0 1400.7 -227.7 -19.41
2003.06-2006.09 444.3 1521.5 258.0 2223.8 1337.2 860.5 2197.7 1513.5 +684.1 +31.10
2006.10-12** 16.1 169.3 22.6 208.0 0.0 15.7 15.7 116.5 -100.8 -642.04
2007** 543.6 1404.8 207.9 2156.3 1331.4 815.4 2146.8 1118.2 +1028.6 +47.91
2008.01-09** 456.0 1183.2 166.7 1805.9 727.4 656.7 1384.1 1191.0 +193.1 +13.95
2006.10-2008.09 418.3 1490.7 209.4 2118.4 1031.8 877.4 1909.1 1459.3 +449.8 +23.60
2008.10-12*** 72.8 329.8 46.4 449.0 4.7 133.3 138.0 551.5 -413.5 -299.64
2009*** 445.3 1346.6 228.1 2020.0 827.3 373.0 12003 1665.3 -465.0 -38.74
2010*** 566.2 1817.5 325.0 2708.7 928 1249.3 2177.3 2620.0 -442.7 -20.33
2011*** 276.2 1027.5 221.1 1524.8 148.4 201.2 349.6 1460.0 -1110.4 -371.61
2008.10-2011.12 454.1 1426.2 246.8 2127.1 659.0 653.4 1312.3 1871.9 -559.6 -42.64
2003.06-2011.12 461.6 1459.2 246.2 2167.0 997.4 751.3 1748.6 1643.3 +105.3 +6.02
During the impoundment Phase II of TGR (October 2006 to September 2008), water level of the reservoir increased from 145 m during rainy period to 156 m during dry period, and the corresponding flood storage capacity can be up to 110.8×108 m3 1( “Report on the River-Lake Relationship and Flood Control in the Middle and Lower Reaches of Yangtze River”. (Edited by Changjiang (Yangtze) Water Resources Committee, 2006)). The multi-year mean annual inflow runoff to the Dongting Lake during the impoundment phase decreased respectively by 206.6×108 m3 and 26.0×108 m3 compared with the time period 1999-2002 and the impoundment Phase I. Similarly, the annual mean runoff of the Four Rivers decreased by 327.0×108 m3 and 30.8 ×108 m3 respectively compared with the time period 1999-2002 and the impoundment Phase I. This can be explained by the drought in South China during the time period (Chen, 2010). Correspondingly, the sediment discharge of the Three Outlets during the phase decreased by 4624.2×104 t and 305.5×104 t and the sediment discharge of the Four Rivers varied by -293.9×104 t and +16.9×104 t (where “+” and “-” indicate deposition and erosion, respectively) compared to the two aforementioned periods. The outflow sediment discharge from the Dongting Lake at Chenglingji varied slightly compared to the two aforementioned time periods. This resulted in an annual mean sediment deposition amount of 449.8×104 t in the lake during this impoundment phase. The deposition amount during the time period decreased by 4346.6×104 t and 234.3×104 t compared to the two aforementioned time periods. It is notable that the lakebed sediment erosion amount was for the first time higher than the deposition amount during the time period of October to December 2006. This was largely associated with the drought in the Yangtze River watershed during the time period (P = -18.12%), and runoff at Zhicheng and the Three Outlets during the time period was only 586.4×108 m3 and 16.1×108 m3, respectively. The number of the flow-break days at Shadaoguan, Mituosi, Kangjiagang and Guanjiapu in 2006 were respectively 269, 206, 235 and 336. This further substantiated that the lakebed sediment S/E regimes in Dongting Lake can be largely controlled by upstream hydrological conditions.
The impoundment Phase III of TGR occurred in October 2008 to December 2011. The water level of the reservoir increased from 145 m in flood season to 175 m in non-flood season during this phase. The multi-year mean annual runoff from the Three Outlets varied by -170.8×108 m3, +9.8×108 m3 and +35.8×108 m3 (where “+” and “-” denote increase and decrease, respectively) compared to the period 1999-2002 and the impoundment Phases I and II. Correspondingly, the sediment discharge from the Three Outlets decreased by 4997.0×104 t, 678.2×104 t and 372.8×104 t, respectively, compared to the three aforementioned periods. This exhibited the significance of TGR operation in reducing the lakebed sediment deposition amount in the downstream linked Dongting Lake during the impoundment Phase III. The annual inflow runoff from the Four Rivers during the time period decreased by 21.54%, 6.27% and 4.33% compared to the three aforementioned periods. Correspondingly, the sediment discharge from Dongting Lake at Chenglingji varied respectively by -158.9×104 t, +358.4×104 t and +412.6×104 t compared to the three aforementioned periods. This resulted in a total sediment erosion amount higher than the erosion amount in the lake during this impoundment phase and the annual mean sediment erosion amount in the lake can be up to 559.6×104 t. The years 2009 and 2010 were both normal flow year in the middle reaches of the Yangtze River and lakebed sediment erosion amount in the two years can be respectively up to 465.0×104 t and 442.7×104 t. This implied that compared with the impoundment Phase II, the impoundment Phase III exhibited a better capability in reducing the sediment deposition amount in the lake.

5.4 Variation of lakebed sediment S/E regimes under different dispatching modes

The lakebed sediment S/E regimes transformed from a siltation-dominant to an erosion-dominant state under the pre-discharge dispatch (May to June) of TGR (Table 5). The mean sediment erosion amounts in May of the impoundment Phases I, II and III were respectively 65.7×104 t, 71.5×104 t and 147.0×104 t. The corresponding sediment S/E amounts in June of the aforementioned three impoundment phases were respectively +172.8×104 t, +77.5×104 t and -84.4×104 t. The sediment S/E regimes were dominated by siltation under the flood-storage dispatch (July to August). The sediment deposition amount under this dispatch decreased from 1082.0×104 t in impoundment Phase I to 838.0×104 t in Phase II and further to 507×104 t in Phase III. During the water-storage dispatch (September to October), the sediment S/E amount varied from +396.0×104 t in Phase I to +49.5×104 t in Phase II and further to -143.8×104 t in Phase III. Similar to the pre-discharge dispatch, the S/E regimes under the water-supplement dispatch (December to April) were dominated by erosion. The sediment erosion amount under this dispatch in the aforementioned three phases was respectively 470.7×104 t, 293.5×104 t and 700.8×104 t. This indicated that the lakebed sediment deposition amount decreased dramatically and the intra-annual erosion period prolonged from the impoundment Phase I to Phase III.
Table 5 Variations of monthly mean sediment S/E amount (104 t) in Dongting Lake during different impoundment phases of the Three Gorges Reservoir. Depo: Deposition amount; Eros: Erosion amount; “+”: deposition; “-”: erosion
Time (yr) Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Depo Eros
1999-2002 -60 -48 -150 -204 -23 +754 +2095 +1504 +995 +151 -106 -78 +5500 -668
2003 -93 -127 -145 -160 -94 +333 +1752 +79 +649 -69 -26 -18 +2813 -734
2004 -18 -22 -171 -76 -79 +119 +430 +38 +844 -49 -51 -27 +1432 -493
2005 -52 -325 -100 -68 -28 +154 +582 +1137 +248 +16 -84 -29 +2137 -687
2006 -55 -56 -193 -202 -90 +85 +397 -87 -21 -28 -33 -40 +482 -805
Phase I -42 -134 -155 -115 -66 +173 +790 +292 +430 -34 -54 -25 +1685 -624
2007 -47 -39 -102 -33 -64 +124 +558 +646 +108 -56 -25 -28 +1437 -394
2008 -33 -28 -128 -109 -79 +31 +70 +402 +75 -98 -257 -58 +577 -790
Phase II -40 -34 -115 -71 -72 +78 +314 +524 +92 -42 -29 -34 +1007 -436
2009 -38 -66 -330 -258 -194 -101 +160 +550 -41 -42 -49 -54 +710 -1172
2010 -78 -35 -81 -526 -157 +51 +726 +162 +5 -247 -62 -163 +944 -1340
2011 -106 -68 -159 -85 -89 -203 +1 -78 -34 -95 -91 -98 +1 -1109
Phase III -74 -56 -190 -287 -147 -84 +296 +211 -23 -121 -115 -93 +507 -1191
Average -53 -80 -158 -168 -98 +66 +520 +317 +204 -74 -75 -57 +1106 -764

6 Thresholds for water and sediment regulation of upstream TGR

The regulation and storage capacity of natural lake ecosystems should be maintained at a certain level to achieve a healthy state from the perspective of lakebed sediment deposition. The capacity was especially important in terms of catastrophic flood or long-term drought. Furthermore, the capacity needs to be controlled under the level of self-regulation capability of the River-Lake ecosystem to avoid an excessive anthropogenic interference (He et al., 2006). The multi-year mean inflow sediment discharge to the Dongting Lake from the Three Outlets could account for 80% of the total inflow sediment amount. Significantly positive correlation was found between the monthly mean lakebed sediment S/E rate and the monthly mean inflow rate of the Three Outlets (r2=0.87, p<0.0001, Figure 5). By investigating the regression function, and the threshold for the inflow rate from the Three Outlets was estimated as 970.81 m3/s. Similarly, significant and positive correlation was found between the monthly mean lakebed sediment S/E rate and the monthly mean inflow sediment delivery rate from the Three Outlets (r2=0.973, p<0.0001). The threshold for the inflow sediment delivery rate from the Three Outlets was estimated as 466.82 kg/s based on the correlation function. The thresholds were transformed into sediment concentration (Hu and Zhang, 2006) by dividing the threshold of sediment delivery rate by the flow rate, and the threshold of sediment concentration at the upstream Three Outlets was estimated as 0.481 kg/m3.
Figure 5 Relationship between inflow rate from the Three Outlets and the sediment S/E rate in the Dongting Lake
The River-Lake relationship changed dramatically after the operation of TGR and the resulted variation of the lakebed sediment S/E regimes in the Dongting Lake. We used the hydrological series from June 2003 to December 2011 to validate the thresholds estimated. It is notable that the lakebed sediment S/E regimes were dominated by erosion when the inflow rate and sediment delivery rate from the Three Outlets were respectively lower than 970.81 m3/s and 466.82 kg/s (Figure 6). This indicated that the thresholds derived were relatively robust and were relatively straightforward for operation. For example, the mean daily inflow rate from the Three Outlets was 865 m3/s in 2011. The number of days with mean daily flow rate higher than 970.81 m3/s was 91, include time periods from 15 June to 16 August, 20 to 28 September and 6 to 14 November. The flow rate during these time periods can be controlled under the threshold to maintain an erosion-dominant state in the lake. It is noteworthy that, apart from the inflow runoff and sediment discharge amount from the Three Outlets, the lakebed sediment S/E regimes can also be influenced by the hydrological conditions of the Four Rivers and the lake basin itself.
Figure 6 The variations of the flow rate and sediment delivery rate of the Three Outlets and the sediment S/E rate of the Dongting Lake under different impoundment phases of TGR

7 Conclusions

(1) The lakebed sediment S/E regimes transformed from a siltation-dominant to an erosion-dominant state during the impoundment Phase II. The intra-annual erosion-dominant state prolonged and the state dominated in pre-discharge, water-storage and water- supplement dispatch. The sediment deposition amount decreased dramatically from the impoundment Phase I to III.
(2) The thresholds for upstream hydrological condition regulation were relatively robust and straightforward. A vast amount of sediment was deposited in the Dongting Lake over the last six decades, and posed as impediments for water supply and transportation in the surrounding area.
(3) The thresholds were derived based on the assumption that no external condition, e.g. meteorological condition, in the watershed was changed after the operation of TGR compared to the period before the operation of TGR. In addition to the hydrological conditions at the upstream Three Outlets, the lakebed sediment S/E regimes were also influenced by the hydrological conditions at the lake outlet Chenglingji.
(4) The variation of hydrological conditions in the lake watershed is a combination effects of local climate change and anthropogenic activities. Further studies considering the lakebed sediment S/E regimes mediated by the local climate change and human activities are therefore needed.

The authors have declared that no competing interests exist.

1
Chen Jin, 2010. Approach on drought defying operation of Three Gorges Reservoir.Journal of Yangtze River Scientific Research Institute, 27(5): 19-23. (in Chinese)

2
Dai Shibao, Yang Shilun, Zhao Huayunet al., 2005. Response of middle and lower reaches of Yangtze River to the initial operation stage of the Three Gorges Project.Journal of Sediment Research, (5): 35-39. (in Chinese)

3
Duan Wenzhong, Zheng Yahui, Liu Jianjun, 2001. Causes of water level rising in Chenglingji-Luoshan reach of Changjiang River.Journal of Hydraulic Engineering, (2): 29-34. (in Chinese)

4
Fu Renshou, Qi Meilan, Fang Hongweiet al., 2005. Sediment transport characteristics of Yangtze River in river section from Yichang to Hankou.Journal of Hydraulic Engineering, 36(1): 35-41. (in Chinese)

5
Han Qiwei, 1999. Changes of flood situation along the middle Yangtze River.Journal of Sediment Research, (5): 1-12. (in Chinese)

6
He Yong, Li Yitian, Wu Daoxiet al., 2006. Flow and sediment process versus river health.Journal of Hydraulic Engineering, 37(11): 1354-1359. (in Chinese)

7
Hu Chunhong, Zhang Zhihao, 2006. Evolution and control of estuary sandbar in Yellow River responding to variation of flow sediment condition.Journal of Hydraulic Engineering, 37(5): 511-517. (in Chinese)

8
Keown M P, Dardeau Jr. E A, Causey E M, 1986. Historic trends in the sediment flow regime of the Mississippi River.Water Resources Research, 22(11): 1555-1564.

9
Li Jingbao, Chang Jiang, Lv Dianqinget al., 2009. The hydrological effect between Jingjiang River and Dongting Lake during the initial period of Three Gorges Project operation.Acta Geographica Sinica, 64(11): 1342-1352. (in Chinese)

10
Li Jingbao, Wang Kelin, Qin Jianxinet al., 2005. The evolution of annual runoff and sediment in the Dongting Lake and their driving forces.Acta Geographica Sinica, 60(3): 503-510. (in Chinese)

11
Li Jingbao, Zhang Zhaoqing, Ou Chaominet al., 2011. Responses of water regimes in Dongting Lake area under different dispatching modes during the running period of the Three Gorges Reservoir.Acta Geographica Sinica, 66(9): 1251-1260. (in Chinese)

12
Li Yitian, Guo Xiaohu, Tang Jinwuet al., 2009. Changes on runoff division from Jingjiang reach of the Yangtze River to Dongting Lake after the operation of TGR.Journal of Basic Science and Engineering, 17(1): 21-31. (in Chinese)

13
Lu Jinyou, Huang Yue, Gong Ping, 2006. Scouring and silting variation in middle and lower channel of the Yangtze River after TGP.Yangtze River, 37(9): 55-57. (in Chinese)

14
Lu Jinyou, Luo Hengkai, 1999. Preliminary analysis on variation of the relation between Yangtze River and Dongting Lake.Yangtze River, 30(4): 24-26. (in Chinese)

15
Sharaf El Din S H, 1977. Effect of the Aswan High Dam on the Nile flood and on the estuarine and coastal circulation pattern along the Mediterranean Egyptian coast.Limnology and Oceanography, 22(2): 194-207.

16
Walling D E, 2006. Human impact on land-ocean sediment transfer by the world’s rivers.Geomorphology, 79(3/4): 192-216.

17
Wang Huilin, Liang Xing, 2003. Analysis on flood storage function of the Dongting Lake.Geography and Geo-Information Science, 19(3): 63-66. (in Chinese)

18
Xu Gui, Huang Yunxian, Li Xichunet al., 2004. Analysis on causes of water level rising at Chenglingji hydrological station of Changjiang River.Journal of Hydraulic Engineering, 35(8): 33-37. (in Chinese)

19
Zhang Zhen, Yang Shilun, Li Peng, 2010. Quantifying the influence of water impoundment Phases I and II of the Three Gorges Reservoir on downstream suspended sediment flux.Acta Geographica Sinica, 65(5): 623-631. (in Chinese)

20
Zhong Zhiyu, Hu Weizhong, 2008. On relation of river and lake.Yangtze River, 39(1): 20-23. (in Chinese)

Outlines

/