Journal of Geographical Sciences >
Enhanced lakebed sediment erosion in Dongting Lake induced by the operation of the Three Gorges Reservoir
*Corresponding author: Li Jingbao (1951-), Professor, E-mail:lijingbao1951@126.com
Author: Zhou Yongqiang (1988-), PhD, specialized in unraveling the dynamics of lake ecosystem. E-mail:yohnchou917251@126.com
Received date: 2015-02-09
Accepted date: 2015-03-20
Online published: 2015-07-17
Supported by
National Natural Science Foundation of China, No.41071067
Program of the Key Discipline Construction of the Physical Geography in Hunan Province
Copyright
Based on field-survey hydrological series in the Dongting Lake watershed from 1951 to 2011, the variations of lakebed sediment siltation/erosion (S/E) regimes of the Dongting Lake after the operation of the Three Gorges Reservoir (TGR) were analyzed. Significantly positive correlations were found between the flow rate from Zhicheng and the Three Outlets (r2=0.859, p<0.0001), and between the flow rate and sediment delivery rate at the Three Outlets (r2=0.895, p<0.0001). This indicated that the flow rate and sediment delivery rate at the Three Outlets were largely determined by the flow rate from the upstream Yangtze River. Sediment deposition amount in the Dongting Lake basin dropped from +4796.4×104 t during the period before the operation of TGR (1999-2002) to +684.1×104 t, +449.8×104 t and -559.6×104 t during the impoundment Phases I, II and III of TGR. The S/E regimes changed from a siltation-dominant to an erosion-dominant state under the pre-discharge, water-storage and water-supplement dispatch over the impoundment from Phase I to III. The sediment deposition amount decreased dramatically under the flood-storage dispatch over the impoundment Phase I to III. The estimated annual mean flow rate, sediment delivery rate and sediment concentration thresholds were respectively 970.81 m3/s, 466.82 kg/s and 0.481 kg/m3 for the upstream Three Outlets to maintain an erosion-dominant state in the downstream linked the Dongting Lake.
ZHOU Yongqiang , LI Jingbao , ZHANG Yunlin , ZHANG Xinping , LI Xichun . Enhanced lakebed sediment erosion in Dongting Lake induced by the operation of the Three Gorges Reservoir[J]. Journal of Geographical Sciences, 2015 , 25(8) : 917 -929 . DOI: 10.1007/s11442-015-1210-y
Figure 1 Locations of hydrological stations in the Dongting Lake watershed |
Figure 2 Relationships between the flow rate at Yichang and the outflow rate from the Three Gorges Reservoir (a) and between the flow rate at Yichang and Zhicheng (b) |
Figure 3 Relationships between the flow rate at Zhicheng and at the Three Outlets (a) and between the flow rate and sediment delivery rate at the Three Outlets (b) |
Figure 4 Variations of runoff and sediment discharge from the Three Outlets and sediment S/E amount of the Dongting Lake in different periods of time |
Table 1 Variations of annual mean runoff (108 m3), sediment discharge and deposited (104 t) and corresponding deposition rate (%) in the Dongting Lake during the time periods before the operation of the Three Gorges Reservoir. The Three Outlets: TO; The Four Rivers: FR; Ungauged region: UGR |
Period | Annual mean inflow runoff | Inflow sediment discharge | Outflow sediment discharge | Sediment deposited amount | Sediment deposition rate | |||||
---|---|---|---|---|---|---|---|---|---|---|
TO | FR | UGR | The sum | TO | FR | The sum | ||||
1951-1958 | 1612.6 | 1741.9 | 299.1 | 3653.6 | 23041.6 | 4230.6 | 27272.2 | 6715.7 | 20556.5 | 75.38 |
1959-1966 | 1335.5 | 1536.9 | 225.8 | 3098.2 | 18988.3 | 2905.7 | 21894.0 | 5786.0 | 16108.0 | 73.57 |
1967-1972 | 1024.9 | 1727.9 | 255.3 | 3008.1 | 14174.0 | 4080.0 | 18254.0 | 5246.0 | 13008.0 | 71.26 |
1973-1980 | 836.5 | 1698.9 | 256.2 | 2791.6 | 11075.8 | 3712.5 | 14788.3 | 3828.8 | 10959.5 | 74.11 |
1981-1998 | 694.4 | 1702.9 | 316.0 | 2713.3 | 9340.7 | 2347.2 | 11687.9 | 2952.8 | 8735.1 | 74.74 |
1999-2002 | 624.9 | 1817.7 | 372.9 | 2815.5 | 5655.9 | 1171.3 | 6827.2 | 2030.8 | 4796.4 | 70.25 |
Table 2 Variations of monthly mean sediment S/E amount (104 t) in the Dongting Lake during the time periods before the operation of TGR. Depo: Deposition amount; Eros: Erosion amount |
Time (yr) | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Dep | Ero |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1951-1958 | -132 | -183 | -351 | -487 | 565 | 2496 | 8183 | 7556 | 2731 | 507 | -93 | -219 | 22545 | -1683 |
1959-1966 | -124 | -211 | -384 | -409 | 449 | 1671 | 5806 | 5284 | 3619 | 888 | -184 | -252 | 21337 | -1564 |
1967-1972 | -115 | -134 | -327 | -405 | 861 | 1872 | 5364 | 3077 | 2450 | 700 | -145 | -163 | 14323 | -1290 |
1973-1980 | -40 | -125 | -185 | -243 | 389 | 2017 | 3566 | 2945 | 2231 | 574 | -78 | -81 | 11722 | -752 |
1981-1998 | -83 | -134 | -211 | -201 | 87 | 1041 | 4078 | 2519 | 1570 | 263 | -87 | -79 | 9558 | -795 |
1999-2002 | -60 | -48 | -150 | -204 | -23 | 754 | 2095 | 1504 | 995 | 151 | -106 | -78 | 5500 | -668 |
Table 3 Departures of runoff in the middle and lower reaches of the Yangtze River during different water impoundment phases of TGR |
Phase | Phase I | Phase II | Phase III | ||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Time | 2003.6-12 | 2004 | 2005 | 2006.1-9 | 2006.10-12 | 2007 | 2008.1-9 | 2008.10-12 | 2009 | 2010 | 2011 |
Depar | +14.04 | +5.54 | +13.52 | -29.19 | -18.12 | +7.00 | +3.29 | +16.40 | +0.92 | +2.69 | -17.29 |
Table 4 Variations of annual mean runoff (108 m3), sediment discharge and deposited (104 t) and corresponding deposition rate (%) in Dongting Lake during different impoundment phases of the Three Gorges Reservoir. The Three Outlets: TO; The Four Rivers: FR; Ungauged region: UGR, *: Impoundment Phase I; **: Phase II; ***: Phase III; “+”: deposition; “-”: erosion |
Time (yr) | Annual mean inflow runoff | Inflow sediment discharge | Outflow sediment discharge | Sediment deposited amount | Sediment deposition rate | |||||
---|---|---|---|---|---|---|---|---|---|---|
TO | FR | UGR | The sum | TO | FR | The sum | ||||
1999-2002 | 624.9 | 1817.7 | 372.9 | 2815.5 | 5655.9 | 1171.3 | 6827.2 | 2030.8 | +4796.6 | +70.25 |
2003.06-12* | 551.5 | 724.4 | 155.8 | 1449.7 | 2020.9 | 1374.5 | 3415.4 | 716.8 | +2698.6 | +79.01 |
2004* | 524.7 | 1499.4 | 306.0 | 2330.1 | 1448.0 | 914.6 | 2362.6 | 1429.9 | +932.7 | +39.48 |
2005* | 625.6 | 1510.8 | 261.0 | 2397.4 | 2401.6 | 640.1 | 3041.7 | 1593.5 | +1448.2 | +47.61 |
2006.01-09* | 166.5 | 1385.0 | 184.5 | 1736.0 | 162.0 | 1011.0 | 1173.0 | 1400.7 | -227.7 | -19.41 |
2003.06-2006.09 | 444.3 | 1521.5 | 258.0 | 2223.8 | 1337.2 | 860.5 | 2197.7 | 1513.5 | +684.1 | +31.10 |
2006.10-12** | 16.1 | 169.3 | 22.6 | 208.0 | 0.0 | 15.7 | 15.7 | 116.5 | -100.8 | -642.04 |
2007** | 543.6 | 1404.8 | 207.9 | 2156.3 | 1331.4 | 815.4 | 2146.8 | 1118.2 | +1028.6 | +47.91 |
2008.01-09** | 456.0 | 1183.2 | 166.7 | 1805.9 | 727.4 | 656.7 | 1384.1 | 1191.0 | +193.1 | +13.95 |
2006.10-2008.09 | 418.3 | 1490.7 | 209.4 | 2118.4 | 1031.8 | 877.4 | 1909.1 | 1459.3 | +449.8 | +23.60 |
2008.10-12*** | 72.8 | 329.8 | 46.4 | 449.0 | 4.7 | 133.3 | 138.0 | 551.5 | -413.5 | -299.64 |
2009*** | 445.3 | 1346.6 | 228.1 | 2020.0 | 827.3 | 373.0 | 12003 | 1665.3 | -465.0 | -38.74 |
2010*** | 566.2 | 1817.5 | 325.0 | 2708.7 | 928 | 1249.3 | 2177.3 | 2620.0 | -442.7 | -20.33 |
2011*** | 276.2 | 1027.5 | 221.1 | 1524.8 | 148.4 | 201.2 | 349.6 | 1460.0 | -1110.4 | -371.61 |
2008.10-2011.12 | 454.1 | 1426.2 | 246.8 | 2127.1 | 659.0 | 653.4 | 1312.3 | 1871.9 | -559.6 | -42.64 |
2003.06-2011.12 | 461.6 | 1459.2 | 246.2 | 2167.0 | 997.4 | 751.3 | 1748.6 | 1643.3 | +105.3 | +6.02 |
Table 5 Variations of monthly mean sediment S/E amount (104 t) in Dongting Lake during different impoundment phases of the Three Gorges Reservoir. Depo: Deposition amount; Eros: Erosion amount; “+”: deposition; “-”: erosion |
Time (yr) | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Depo | Eros |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1999-2002 | -60 | -48 | -150 | -204 | -23 | +754 | +2095 | +1504 | +995 | +151 | -106 | -78 | +5500 | -668 |
2003 | -93 | -127 | -145 | -160 | -94 | +333 | +1752 | +79 | +649 | -69 | -26 | -18 | +2813 | -734 |
2004 | -18 | -22 | -171 | -76 | -79 | +119 | +430 | +38 | +844 | -49 | -51 | -27 | +1432 | -493 |
2005 | -52 | -325 | -100 | -68 | -28 | +154 | +582 | +1137 | +248 | +16 | -84 | -29 | +2137 | -687 |
2006 | -55 | -56 | -193 | -202 | -90 | +85 | +397 | -87 | -21 | -28 | -33 | -40 | +482 | -805 |
Phase I | -42 | -134 | -155 | -115 | -66 | +173 | +790 | +292 | +430 | -34 | -54 | -25 | +1685 | -624 |
2007 | -47 | -39 | -102 | -33 | -64 | +124 | +558 | +646 | +108 | -56 | -25 | -28 | +1437 | -394 |
2008 | -33 | -28 | -128 | -109 | -79 | +31 | +70 | +402 | +75 | -98 | -257 | -58 | +577 | -790 |
Phase II | -40 | -34 | -115 | -71 | -72 | +78 | +314 | +524 | +92 | -42 | -29 | -34 | +1007 | -436 |
2009 | -38 | -66 | -330 | -258 | -194 | -101 | +160 | +550 | -41 | -42 | -49 | -54 | +710 | -1172 |
2010 | -78 | -35 | -81 | -526 | -157 | +51 | +726 | +162 | +5 | -247 | -62 | -163 | +944 | -1340 |
2011 | -106 | -68 | -159 | -85 | -89 | -203 | +1 | -78 | -34 | -95 | -91 | -98 | +1 | -1109 |
Phase III | -74 | -56 | -190 | -287 | -147 | -84 | +296 | +211 | -23 | -121 | -115 | -93 | +507 | -1191 |
Average | -53 | -80 | -158 | -168 | -98 | +66 | +520 | +317 | +204 | -74 | -75 | -57 | +1106 | -764 |
Figure 5 Relationship between inflow rate from the Three Outlets and the sediment S/E rate in the Dongting Lake |
Figure 6 The variations of the flow rate and sediment delivery rate of the Three Outlets and the sediment S/E rate of the Dongting Lake under different impoundment phases of TGR |
The authors have declared that no competing interests exist.